A paver count is a materials estimate: the number of individual paving units needed to cover a measured area, plus an allowance for cuts, breakage, and spares. For a 10 by 10 foot patio laid with 16 by 16 inch pavers, that estimate comes out to 57 pavers before waste, and about 63 pavers to order. The rest of this guide shows the arithmetic behind those two numbers, so you can check them, adjust them for joints and patterns, and reuse the same formula on any patio size.
The short answer
A 10 by 10 foot patio covers 100 square feet. One 16 by 16 inch paver covers 1.78 square feet. Divide 100 by 1.78 and you get 56.25, which rounds up to 57 pavers. That is the bare minimum, with zero room for a single cut or cracked piece. Nobody should order exactly 57. Add the standard 10 percent allowance for cutting and breakage and the order becomes 62 pavers. I would order 63. The extra piece costs little, and it covers the one paver that chips on the saw. Keep any leftovers in the garage: a matching spare is worth far more than the few dollars it cost when a paver cracks two years from now. Work out the cost for a 10×10 patio before you order, so the base, sand and labour are all in the budget.
At a glance
- Bare minimum: 57 pavers. A 10 by 10 foot patio is 100 square feet, and one 16 by 16 inch paver covers 1.78 square feet.
- Order: 63 pavers. The standard 10 percent allowance for cuts and breakage takes the order to 62, and one spare on top is cheap insurance.
- Do not order exactly 57: that leaves zero room for a single cut or cracked piece.
Contents
- The short answer
- What a 16×16 paver really covers
- The math, step by step
- Paver counts for common patio sizes
- How much extra to order for cuts and breakage
- What the joints do to your count
- Measuring a patio that is not a neat square
- What else to order with the pavers
- Pallets, batches, and spares
- When to do it yourself and when to call a pro
- Frequently asked questions
- Sources
What a 16×16 paver really covers
A 16 by 16 inch paver is a large-format concrete or stone unit, 16 inches on each side, sold by its nominal size. Nominal size is the name on the label, not always the exact measurement. Most pavers sold as 16 by 16 measure a fraction under that, because the maker builds in room for the joint, and many units carry small spacer nubs on their sides that set the gap automatically. Before you order, check the coverage figure on the pallet label or the product spec sheet. If the sheet says how many pieces cover a square foot, use that number instead of the nominal size.
| Paver size | Area per paver | Pavers per square foot | Best fit | Cutting effort |
|---|---|---|---|---|
| 4 x 8 in brick paver | 0.22 sq ft | 4.50 | Classic patios, driveways | High, many edge cuts |
| 6 x 6 in | 0.25 sq ft | 4.00 | Walkways, accents | High |
| 6 x 9 in | 0.38 sq ft | 2.67 | Linear modern patterns | Medium |
| 12 x 12 in | 1.00 sq ft | 1.00 | Slab patios, stepping stones | Low |
| 16 x 16 in | 1.78 sq ft | 0.56 | Large patios, clean contemporary look | Low |
| 24 x 24 in slab | 4.00 sq ft | 0.25 | Big open patios | Low, but each cut is heavy work |
The “pavers per square foot” column is the number to remember: 144 divided by the paver’s face area in square inches. For a 16 by 16 paver, that is 144 divided by 256, or 0.56 pavers per square foot.
The math, step by step
The formula has four steps, and every step uses numbers you can check with a pocket calculator. Work it in square feet, since that is how patios are measured, and convert the paver size to square feet the same way.
Step 1: find the patio area. Multiply length by width. A 10 foot by 10 foot patio is 10 times 10, or 100 square feet.
Step 2: find the area of one paver. Convert inches to feet first. Sixteen inches divided by 12 is 1.333 feet. Multiply 1.333 by 1.333 and one paver covers 1.78 square feet. Working in square inches gives the same result: 16 times 16 is 256 square inches, and 256 divided by 144 (the square inches in a square foot) is also 1.78.
Step 3: divide the patio by the paver. One hundred square feet divided by 1.78 square feet per paver is 56.25 pavers. You cannot buy a quarter of a paver, so round up to 57. Engineer Fix works the same calculation in square inches, 14,400 divided by 256, and lands on the same 56.25 and the same rounded 57.
Step 4: add the waste allowance. Multiply the exact count by 1.10 for a standard 10 percent allowance. That is 56.25 times 1.10, which is 61.875, rounded up to 62 pavers. My recommendation is 63, which adds one spare beyond the 10 percent for a large-format paver on a small patio, where a single miscut eats a bigger share of the order.
The full formula is: pavers to order equals patio area in square feet, divided by the area of one paver in square feet, times 1 plus the waste percentage, rounded up. Keep that formula. It works for any paver size and any patio size.
One more check worth doing: count the rows. A 10 foot patio is 120 inches wide. Divide 120 by 16 and you get 7.5 pavers across. Seven full pavers plus one half paver per row, times 7.5 rows, gives the same 56.25. The row check catches the common error of forgetting the half pavers at the edges.

Paver counts for common patio sizes
The table below works out the same formula for the patio sizes people ask about most, with a 10 percent waste allowance already included and all counts rounded up to whole pavers.
| Patio size | Area | 16×16 pavers, +10% waste | 12×12 pavers, +10% waste | 24×24 pavers, +10% waste | 4×8 brick pavers, +10% waste |
|---|---|---|---|---|---|
| 8 x 8 ft | 64 sq ft | 40 | 71 | 18 | 317 |
| 10 x 10 ft | 100 sq ft | 62 | 110 | 28 | 495 |
| 12 x 12 ft | 144 sq ft | 90 | 159 | 40 | 713 |
| 12 x 16 ft | 192 sq ft | 119 | 212 | 53 | 951 |
| 16 x 16 ft | 256 sq ft | 159 | 282 | 71 | 1,268 |
| 20 x 20 ft | 400 sq ft | 248 | 440 | 110 | 1,980 |
Two things stand out. First, the 16 by 16 column stays small: a 10 by 10 patio needs 62 pavers with waste, where the same patio in brick pavers needs 495. Second, the count scales with area, not with the side length. A 20 by 20 patio is four times the area of a 10 by 10, so it needs four times the pavers, not twice.
How much extra to order for cuts and breakage
The waste allowance is not padding. It pays for three real things: pavers cut to fit the edges, pavers that crack during cutting or handling, and offcuts that are too small or wrongly shaped to reuse. The right percentage depends on the pattern and the shape, not on optimism.
| Pattern or shape | Extra to order | Why | 10×10 patio in 16×16 pavers |
|---|---|---|---|
| Stack bond, straight rows | 5% | Square cuts only, offcuts often reusable | 60 pavers |
| Running bond, offset rows | 5 to 10% | Half pavers at alternating edges | 60 to 62 pavers |
| Basketweave | 5 to 10% | Pairs alternate direction, edges stay square | 60 to 62 pavers |
| Herringbone at 90 degrees | 10 to 15% | Angled cuts at every edge | 62 to 65 pavers |
| Herringbone at 45 degrees | 15 to 20% | Nearly every edge paver is cut on an angle | 65 to 68 pavers |
| Curves, circles, or an L shape | 15 to 20% or more | Cuts follow a radius, offcuts rarely fit elsewhere | 65 to 68 pavers or more |
These ranges match the pattern tables published by CalcWall and by the paver calculator guides, which put straight patterns at 5 to 10 percent, herringbone at 10 to 15 percent, and diagonal or curved work at 15 to 20 percent. For a plain square 10 by 10 patio in stack bond or running bond, 10 percent is the safe middle. That is 62 pavers, and my recommendation of 63 adds a single spare on top.
A border course helps too. A soldier course, a row of pavers set side by side around the edge, gives the field cuts something straight to land against, and it often keeps waste near the low end of the range. Count the border pavers in the same total.
Concrete pavers chip. A cut that wanders, a paver dropped on a corner, a pallet handled roughly: each one costs a piece. The 10 percent allowance covers a few broken pieces on a job this size. If your delivery arrives with visible damage, photograph it and call the yard before you start laying. Our guide to cutting patio pavers to fit the edges covers the saw setup and the safety gear.
What the joints do to your count
Pavers are not laid tight together. The joints between them, usually 1/16 to 3/16 of an inch wide, are filled with sand so the pavers lock together and can shift slightly without chipping. CalcWall’s guide notes that Belgard’s technical guidance puts joints at 1/16 to 3/16 of an inch, with 1/8 of an inch the usual choice for standard products.
Joints make each paver take up slightly more space, which lowers the count a little. With a 1/8 inch joint, a 16 by 16 paver effectively covers 16.125 by 16.125 inches, or 1.81 square feet. Divide 100 by 1.81 and the base count drops from 57 to 56 pavers, and with 10 percent waste the order drops from 62 to 61. That is a difference of one paver on a job this size.
Should you order 61 instead of 63, then? No. The joint saving is real but small, and it disappears the moment a paver measures a hair under nominal or a cut goes wrong. Treat the joint as a safety margin that stays in your pocket, not as a discount on the order. The one place joints do change the order is with small pavers: on 4 by 8 brick, a 1/8 inch joint drops the count from 4.5 to 4.3 pavers per square foot, which is about 20 fewer pavers on a 100 square foot patio.
Measuring a patio that is not a neat square
Most patios are rectangles, and a rectangle is length times width. For anything else, break the shape into rectangles, measure each one, and add them together. An L-shaped patio is two rectangles. For a patio with a step or a grill pad left unpaved, measure the whole rectangle, subtract the unpaved area, and order for what is left.
For a circle, the area is the radius times itself times 3.14. A 10 foot diameter circle has a 5 foot radius, so 5 times 5 times 3.14 is about 79 square feet. That is 45 pavers before waste, and with the higher waste figure a curved edge demands, about 52 to order. For a curved edge on an otherwise square patio, measure the shortest depth and the longest depth, average them, and multiply by the width.
Three measuring mistakes cause most short orders. The first is measuring the excavation instead of the finished patio: you dig 6 to 12 inches wider on every side for the edge restraint, but you order pavers for the finished dimension only. The second is measuring once, so measure twice and write the numbers down. The third is forgetting to square the corners. Check the layout with a 3-4-5 triangle: mark 3 feet along one side and 4 feet along the other, and the diagonal between those marks should be 5 feet.
What else to order with the pavers
The pavers are the top layer of a system. From the bottom up: firm soil, compacted crushed stone base, one inch of bedding sand, the pavers with sand in the joints, and an edge restraint holding the outside row.
Base stone. The standard is 4 inches of compacted crushed stone for a patio, with 6 inches the common choice where the ground freezes. CalcWall’s guide cites Belgard’s minimum of 4 inches compacted for patios and walkways. For a 10 by 10 patio at 6 inches, the math is 100 square feet times 6 inches divided by 12, which is 50 cubic feet, or about 1.9 cubic yards. Crushed base stone weighs roughly 1.4 tons per cubic yard, so that is about 2.6 tons. Order roughly 10 percent extra to allow for compaction and spillage, which brings it to about 2.9 tons. If you would rather have the arithmetic done for your exact depth and area, our paver base calculator runs the same conversion.
Bedding sand. One inch of coarse concrete sand, screeded flat, is the setting bed the pavers sit on. For 100 square feet that is about 8.3 cubic feet, roughly 0.4 tons. Use coarse concrete sand, not play sand or mason sand. The bedding layer is a setting bed, not a leveling compound, so do not try to fix low spots in the base with extra sand.
Joint sand. After the pavers are laid and compacted, sand is swept into the joints. Polymeric sand is the usual choice for a patio. For a 10 by 10 patio, plan on one to two bags.
Edge restraint. Any edge that is not held by a wall, a curb, or the house needs one. Without it, the outside rows creep outward, the joints open, and the whole field loosens. For a 10 by 10 patio against the house, that is 30 feet of edging along the three open sides, plus spikes at roughly one per foot.
Slope. A patio should never be level. It should be flat, which is not the same thing. Flat means a consistent plane, and that plane needs to tilt away from the house so water leaves. The standard is a quarter inch of fall per foot of run, so a 10 foot patio needs about 2.5 inches of total drop from the house edge to the outer edge. Set it with a string line before you dig, because you cannot correct pitch at the sand stage.

If you want the full sequence from base to finished patio, our guide to how to lay pavers walks through each layer in order. And if the patio is part of a bigger project, our guide to building a patio with pavers from start to finish covers planning, sizing, and the base build together.
Pallets, batches, and spares
Pavers are usually sold by the pallet or by the square foot. Coverage per pallet changes with the product, so the number comes from the manufacturer’s cut sheet, not from a rule of thumb. Kelly Supply Co.’s pallet guide works through the method: measure the area, add overage, divide by the coverage on the cut sheet, and round up. Their worked example uses a Belgard cut sheet for the Mega-Arbel 60mm paver, which lists 104.4 square feet per pallet. That figure belongs to that product only, but it shows the scale: a 10 by 10 patio is roughly one pallet of large-format pavers, plus spares.
Ask the yard how many pieces are on a pallet of your paver before you order. If a pallet holds 60 pavers and you need 63, you are buying two pallets or a pallet plus a partial, so ask whether the yard sells part of one. Rounding up to whole pallets is cheaper than a second delivery for a handful of pavers.
Buy everything at once, from the same production run. Color varies between batches, and the difference shows on a patio. When you lay, pull pavers from three or four pallets at a time so the color blends across the patio instead of changing in patches.
Keep spares. A dozen or so pieces in the garage is the usual advice, and on a 63-paver order that means the one or two leftovers after the 10 percent allowance, plus anything uncut. A paver stained by oil or cracked by a dropped grill is easy to swap if you have a matching one. It is nearly impossible to match a year later, when the batch is gone and the color has weathered.
When to do it yourself and when to call a pro
Counting pavers is the easy part. Laying them is a weekend of heavy work, and the decision to hire it out usually turns on the base, not the pavers. A 10 by 10 patio needs about 2.9 tons of base stone moved, spread, and compacted in layers. That is wheelbarrow work, and it is the part that wears people out.
Do it yourself if the ground is flat, the soil drains, the patio is a simple square, and you can rent a plate compactor and a wet saw for the weekend. The cutting on a 10 by 10 patio in 16 by 16 pavers is modest: a handful of edge pieces and a few halves.
Call a pro if the yard slopes sharply, the soil is heavy clay or stays wet, the patio needs a retaining edge or a step, or the design includes curves and a 45-degree herringbone pattern. A contractor will also do a full material takeoff as part of quoting the job. Get the takeoff in writing and compare it with your number before you sign anything.
Safety notes, kept short: a wet saw throws water and grit, so wear eye protection and hearing protection and keep your hands clear of the blade. A plate compactor vibrates hard enough to numb your hands, so take breaks and wear gloves. Pavers are heavy, and 63 of them add up to well over a ton of lifting, so lift with your legs and get help with the pallets. Call 811 before you dig, anywhere in the United States, so buried utilities get marked.
Once the patio is down, sealing patio pavers protects the surface and the sand, and a simple routine for cleaning patio pavers keeps the joints tight and the color even.
Frequently asked questions
You need 57 pavers to cover the area, and you should order 63. The 63 adds a standard 10 percent allowance for cuts and breakage, plus one spare.
Fifty-seven pavers cover 100 square feet before waste, since each paver covers 1.78 square feet. With a 10 percent waste allowance, order 62, or 63 if you want a spare.
Divide the patio area in square feet by the area of one paver in square feet, then multiply by 1 plus your waste percentage, and round up. For a 16 by 16 paver, one paver covers 1.78 square feet, and 10 percent waste is the standard figure for a straight pattern.
Order 10 percent extra for a straight pattern on a rectangular patio. Use 15 percent for herringbone laid at 45 degrees, curved edges, or circles, where nearly every edge paver needs an angled cut.
Yes, but only slightly for large pavers. A 1/8 inch joint makes each 16 by 16 paver cover about 1.81 square feet instead of 1.78, which drops the order from 62 to 61 pavers. Keep the 10 percent allowance anyway, and treat the joint saving as a safety margin.
It depends on the product, so check the manufacturer’s cut sheet. A 10 by 10 patio is roughly one pallet of large-format pavers plus spares, but confirm the pieces per pallet with your supplier before ordering.
One hundred pavers cover the area, since each 12 by 12 paver covers exactly 1 square foot. Order 110 with a 10 percent waste allowance.
Sources
- Engineer Fix, How Many 16×16 Pavers Do I Need for a 10×10 Patio?
- Deck Contractors Cincinnati, Paver Patio Calculator: Measure, Plan and Estimate
- CalcWall, Free Paver Calculator: Pavers for a Patio or Path
- Kelly Supply Co., How Many Pallets of Stone for a Patio
Last updated: November 20, 2026.
